Welcome to the Trail EAffect Podcast
Dec. 13, 2022

Rich Edwards of the Brad and Alys Smith Outdoor Economic Development Collaborative at West Virginia University #102

Rich Edwards of the Brad and Alys Smith Outdoor Economic Development Collaborative at West Virginia University #102
The player is loading ...
Trail EAffect

Trail EAffect Episode 102 with Rich Edwards of the Brad and Alys Smith Outdoor Economic Development Collaborative at West Virginia University Series

This is Part 3 of a 4 Part Series featuring the Brad and Alys Smith Outdoor Economic Development Collaborative

  • Intro to Rich Edwards
  • Rich Edwards Backstory
  • Why Rich chose the move to West Virginia University
  • The opportunity for trail building in terms of iconic topography in West Virginia
  • What Rich’s Roll is at the Brad and Alys Smith Outdoor Economic Development Collaborative – Outdoor Recreation Infrastructure Coordinator
  • The ways that the OEDC helps West Virginia with Trails and Outdoor Recreation Infrastructure
    • Direct Operational Support
    • Technical Support
    • Education
  • Being Collaborative across all trail user groups and even within user groups
  • Trail Building Companies in West Virginia
  • The east coast and access for trails / South East surge in trail development
  • First Phase of the West Run Woods Trail System in Morgantown, WV
  • Developing Shared Use Trails in Morgantown, WV
  • The 100 Mile Vision
    • Identifying that the Bike Ped infrastructure could use improvement, and adding these improvements via natural surface trails
  • Current Shovel Ready Trail Projects in West Virginia
    • Funded Projects
  • Environmental / NEPA Process
    • Finding of No Significant Impact
    • Environmental Assessment
    • Environmental Impact Statement
    • Categorical Exclusion
  • Multiple Funding Streams applied to trail projects
  • Cacapon State Park, WV
    • Thunderstruck Trail
  • Mountain Biking in State Parks in West Virginia
  • Mylan Park Morgantown BMX Track, UCI Pumptrack and Bike Park Plans
  • More Shovel Ready Projects
  • Marlinton, WV Trail Projects
    • 100 Miles / 10 million Dollars approved in less than one year
  • Elkins West Virginia and an ARC Power Planning Grant
  • Rich going deeper on Planning and Design, and the differences between the two
  • Planning ahead, and getting trail designs ready to shelve until funding becomes available for last minute funding opportunities
    • Having Project Designs / Plans almost shovel ready
  • Rich Life Wisdom and Advice
    • The Darkside of Mountain Biking in general
    • Assume that someone is always listening…
  •  People to Thank and Closing Comments

Links:

Brad and Alys Smith Outdoor Economic Development Collaborative:  https://oedc.wvu.edu/

Rich Edwards Bio:  https://oedc.wvu.edu/about-us/meet-the-team/rich-edwards

Morgantown Area Mountain Bike Association: https://mambawv.org/

Thunderstruck Trail Build Video Series

            Making of Thunderstruck: https://youtu.be/OixNm7nuEbo

            Partnering with Appalachian Conservation Corps: https://youtu.be/BvkLH5ZOwuE

West Run Woods Trail Ribbon Cutting Ceremony: https://youtu.be/xYNDCqlQOrU

Brad D. Smith: https://braddsmith.com/

Ascend West Virginia: https://ascendwv.com/

 

This Podcast has been edited and produced by Evolution Trail Services

Trail EAffect Show Links:

Evolution Trail Services: www.evotrails.com

Contact Josh at evolutiontrails@gmail.com

Support Trail EAffect through donations at: https://www.patreon.com/traileaffect

You can also reach out and donate via PayPal or other means if you feel so inclined to do so.