Welcome to the Trail EAffect Podcast
April 26, 2022

Erin Rushing of Trailblazers in Bentonville, AR (#67)

Erin Rushing of Trailblazers in Bentonville, AR (#67)
The player is loading ...
Trail EAffect

Trail EAffect Episode 67 Erin Rushing of Trailblazers

  • Erin Rushing Back Story
  • The early years of trails and greenways in NW Arkansas
    • Razorback Greenway
  • The Transformation of Trailblazers
    • Unique common areas in Bella Vista that allowed for trail building and access
    • Greenway Extensions into Bella Vista
  • How Trailblazers develops trails
  • Building the Back 40 Trail System in Bella Vista, AR
    • Diversity of Trail Experiences within the Back 40 with different builders
    • 40 miles of trail built in 9 months
    • The Ledges
  • Lessons learned through building out trails in NW Arkansas
    • More Green level trails needed
    • Tuning up the existing system and making trails better in 2022
  • Bicycle Playgrounds for kids in parks
  • Famous Failure and what was learned
    • Experimenting with trail surfaces
    • Quick to react
    • Building smaller systems – Larger / 10 to 12 miles to make a worthwhile trail system
  • More Neighborhood connections in 2022
  • What makes a great trail community according to Erin
  • E Bikes in NW Arkansas
    • Little Sugar as an E bike trail system
    • Commuting to work via trails by E bike
  • Closing Comments

Links:

Trailblazers: https://www.nwatrailblazers.com/

We Are ETHIC: https://weareethic.org/

OZ Trails: https://www.oztrails.com/

Professional Trail Builders Association: https://www.trailbuilders.org/

 

This Podcast has been edited and produced by Evolution Trail Services

 

Trail EAffect Show Support:

Smith’s Bike Shop: https://smithsbikes.com/

Evolution Trail Services: www.evotrails.com

Contact Josh at evolutiontrails@gmail.com

Support Trail EAffect through donations at: https://www.patreon.com/traileaffect

You can also reach out and donate via PayPal or other means if you feel so inclined to do so.